Jan 24, 2023 Leave a message

Specific construction links for swimming pool bricks!

Before the swimming pool brick is paved, you need to master the correct construction method, carefully check in all aspects, and strictly control each construction link.
1. Check the required materials in advance
Before we officially start construction, we need to carefully check the prepared swimming pool tiles in advance to ensure that the number is sufficient. On each box, we must mark the models, color numbers, production batch numbers and other information of the pool tiles in advance.


2. Find the foundation of the flat wall surface
The foundation of the swimming pool wall is mainly to be convenient to operate when posting in the later period, and ensure that the wall on the flat wall is smooth and complete.


3. Start the line work
We can draw lines on the wall, mainly to write down the position of the pool tiles. We can put 3 mosaic pads on the ground, but to ensure that the gray seam between the stickers and the stickers is the same. Next, you can measure the overall width, draw a large grid on the wall, and then divide this geographical grid into 9 squares, and put a swimming pool tile in each piece.


4. Tile glue prepared to paste tiles
We mix tile glue according to the corresponding proportion in advance, use the gray shovel to apply tile glue. We use a smooth gray shovel on the edge to smooth the tile glue, and then use a gray shovel with a jagged edge Striped, we can put tiles directly on the wall.


5. Patch and fixed steps
Because the pool tiles are all bottom -ups, they can be used directly on the wall surface with tile glue to spread the prepared swimming pool tile vertically. It is worthwhile that we ensure that the gray seams and gaps are consistent between each sticker.


6. Reinforcement of tiles
After a fixed positioning of each swimming pool brick, use the ash plate to light the surface of the tiles to make it firmly on the inner wall of the swimming pool.


7. The ash sewing between tiles should be consistent
After completing each tile fixing, we need to ensure that the gap is uniform before forming the sewing material. You can use a small ash shovel to adjust these ash sewing. An important part.


8. Supplement the appropriate sewing agent
We need to prepare the required sewing agents in advance, use a small ash shovel to take a small amount of mixed sewing agent, and apply it to the surface of the pool tiles. From bottom to top, to ensure that the gray seam can be filled with no extra residues.


9. Clean the finish work well
Before the seams are completely dry, we also need to clean the surface of the tiles. Prepare two buckets in advance, one placing agent, the other to put water, wipe the surface of the swimming pool tiles in a circle, and then wipe the residue with water, and wipe the surface with a sponge.

 