Feb 09, 2023 Leave a message

What issues need to pay attention

Swimming pool Pascid Tile Construction Process
1. Concrete pool wall
2. Additive for interface treatment
3. Cement murder slurry batch of flat layers (staying for 7 days to dry)
4. Waterproof treatment
5. Interface processing
6. Waterproof treatment
7. Tile glue paste swimming pool tiles
8. Fill in the sewing agent.


Precautions
1. Patching between the pool mosaic tiles is 10mm apart. On the one hand, because the swimming pool brick was just paved, it did not absorb enough water. Once it was soaked in the water for a long time, the swimming pool brick would rise. On the other hand, according to the heat expansion and contraction of physical phenomena, the swimming pool bricks will change according to different seasons.
2. Professional swimming pool brick tiles:
a. The bricks are discharged according to the size of the brick specifications, and the brick is not as non -bricks as possible. (Note: At the bottom of each pool, the diving pool and the children's pool enter the steps to step the steps need to cut bricks);
b. The swimming pool is a professional swimming pool mosaic tile. Pay attention to the tiles of the tidal lane color signs when exhausting the tiles (can be discharged first), and can be excreted according to the design of the brick drawing. Pay attention to the requirements of related professional installation accessories. It should be arranged in the middle of the brick (or on a few brick symmetrical lines, which can be adjusted moderately if necessary).
3. The glazed corrosion resistance of tiles, acid -alkali resistance, frost resistance, destruction intensity, water absorption rate and other detection related data must meet national standards.
Water absorption rate: average of 0.5%-3%, a single value ≤3.3%; pollution resistance: no less than 3 levels after the test of glaze and pollution-resistant bricks; compressive strength: average ≥ 30, single value ≥27; corrosion resistance resistance; corrosion resistance to corrosion resistance; Sex: After testing, it is not lower than GB; frost resistance: no cracks or peeling after experience.
Color standard: The main bricks in the pool are mainly white, and the lane center line: dark, dark blue or black.
Construction standards: You must set a lane. Each lane is 2.5 meters wide. There is a lane center line in the center of the lane. The training pool specifications are 50x21 meters, with 8 lanes, and the specifications of the competition pool are 50x25 meters, which are 10 lanes.
4. Be sure to use a professional swimming pool with mosaic tiles.

 

Send Inquiry

Home

Phone

E-mail

Inquiry